Run Ball Run
How long can you keep the ball rolling?
In this fast-paced top-down soccer runner, you control a football that never stops moving!
Dodge incoming obstacles, survive as long as possible, and push your score higher and higher as the game gets faster and more chaotic over time.
Simple controls, rising difficulty, and one goal:
Don’t get hit. Beat the high score.
Controls
- Left Arrow / Right Arrow – Move left & right
- That’s it! Easy to learn, hard to master
Features
- Endless runner gameplay
- Increasing difficulty over time
- Score-based progression
- Offline high score system
- Clean and focused soccer-themed experience
Music & Assets
- Music:
Music was taken from Pixabay, created by tatamusic
https://pixabay.com/users/tatamusic-51344851/ - Art & Assets:
All visual assets were hand-drawn by me using Paint 🎨
| Status | Released |
| Platforms | HTML5 |
| Author | retsnom0_0 |
| Made with | Godot |
| Tags | 2D, Endless Runner, Godot, Hand-drawn, High Score, Pixel Art, Singleplayer |
| Content | No generative AI was used |




Comments
Log in with itch.io to leave a comment.
cool art!
Thank you :)